40-series door hinges.

This site may earn a commission from merchant affiliate
links, including eBay, Amazon, Skimlinks, and others.

Joined
Nov 2, 2005
Threads
29
Messages
3,301
Location
California
I should know this, and have searched the archives without an answer.
At the risk of being embarrassed, I'll ask the question:

Why does Toyota assign a different part number for the LH and RH side-door hinges when they appear to be the same except for the hinge pin head position? Since the hinge pins are made removable, with the installer simply flipping the hinge base, it would seem offering just one separated hinge for either tub side would lessen the parts inventory.

My brain is blocked; there must be more to this-- what am I missing?
Is there a past thread explanation I didn't see?
 
Bear,

I had the same question. I think it was just so people wouldn't have to swap the pin... i didnt figure this out thill my parts guy in Saudi told me to swap it to make it work. Man do i miss that guy - he left and went back home some years ago.

Another good question is why does the 1/4 kick out glass gasket on the late model trucks have a different part number for LH and RH. They are identical and no mods needed to work.

-Geoff
 
Never checked but guessing the piece of glass in front of the small vent window is the same as well.
I noticed the short base and mid wheel base 8/80+ transmission crossmember L brackets list a different part number from 10/82 on. I have a set from a 3/82 FJ40 with four speed and a set from a 3/83 BJ42 with a five speed. Different part numbers but the same including the number stamped into the L brackets. The crossmember had a small change but not the L brackets.
 
Another good question is why does the 1/4 kick out glass gasket on the late model trucks have a different part number for LH and RH. They are identical and no mods needed to work.

Probably so the safety glass in facing the correct way? Or so the imprint label on the glass is facing the right way?
Just my two best guesses...
 
This is a little out of the box, but it could be something totally unrelated like an tactic to gain ground during an EBA agreement sign off. Say the workers wanted to raise wages and the company wanted to freeze them. Perhaps the workers were lackadaisical with the truth about superseded parts. 'New' parts needed RnD and casting and moulding and are much more labour intensive. Or maybe someone just screwed up.
 
Back
Top Bottom