I need to move a 2F with bellhousing and clutch assembly from a pallet to an engine stand. Everything is ready to go except I need to know what is involved with removing the bellhousing and clutch.
Does the flywheel need to be removed before the bellhousing? Now don't laugh at the question because there were some six-cylinder Chebby's that needed exactly that.
I'm hoping that I can just lift the whole thing, unbolt the bellhousing and then get to the clutch/PP/flywheel.
The engine stand is mine, but I need to borrow the hoist and I just don't want to tie up the guy's hoist any longer than needed.
Can somebody run me through this?
Thanks,
Ed
Does the flywheel need to be removed before the bellhousing? Now don't laugh at the question because there were some six-cylinder Chebby's that needed exactly that.
I'm hoping that I can just lift the whole thing, unbolt the bellhousing and then get to the clutch/PP/flywheel.
The engine stand is mine, but I need to borrow the hoist and I just don't want to tie up the guy's hoist any longer than needed.
Can somebody run me through this?
Thanks,
Ed