I have a 1967 FJ40 with 1984 FJ60 axles.. I am planning an SOA up front, with a shackle reversal. The spring hangers have been "side stepped" away from the frame approximately 1.5 inches at the rear of the springs, and a little less up front for the FJ60 axles... Now, what I have noticed is that everyone that does a shackle reversal, and an SOA, usually puts the steel tube for the shackle through the frame, by drilling a hole. This setup isnt going to work for me, as I have the 60 axles and the sidestep away from the frame.. I thought about buying the weld in kit from proffits cruisers, or maybe the one from MAF, but dont want the additional lift from the kit on top of my SOA... Is there any ideas on doing this?