Well here we go.
-10c out this morning but I gotta get this done. You folks in CA and S. Texas have got it made.
BRRRR
Below are the pix, no way was I going to be able to reach the back two nuts so they will have to wait until it warms up. Also, how the hell was I supposed to get the clamp on the snorkel side? Air cleanser side was simple but with the cold.....It'll wait.
All in all took two hours, template was almost right on. Unlike others I left it on when I was drilling, worked out ok. Painted and then Krown rust proofed the holes.
-10c out this morning but I gotta get this done. You folks in CA and S. Texas have got it made.
BRRRR
Below are the pix, no way was I going to be able to reach the back two nuts so they will have to wait until it warms up. Also, how the hell was I supposed to get the clamp on the snorkel side? Air cleanser side was simple but with the cold.....It'll wait.
All in all took two hours, template was almost right on. Unlike others I left it on when I was drilling, worked out ok. Painted and then Krown rust proofed the holes.
Last edited: