Resource icon

FSM FZJ80 recommended maintenance procedures 1

No permission to download
FileType
pdf
extract from LandCruiser FSM, maintenance section, ppg MA-1 thru MA-17:
Maintenance schedule (MA-1 thru MA-4)
Preparation (MA-5)
Maintenance operations (MA-6 thru MA-14)
General maintenance (MA-15 thru MA-16)
Service specifications (MA-17)

this was downloaded from TIS, prior to the removal for 1995 model year data; no indication of which FSM this was originally a part of, but it was listed for the 1995 model year
  • Like
Reactions: klaconte
Author
Malleus
Downloads
127
Views
1,080
First release
Last update
Rating
0.00 star(s) 0 ratings
Top Bottom