Yeah Garret was great to work with! I ordered in mid November and he told me mid-late February. There was some parts cut wrong from the machine shop he uses since this is an updated version of the bumper with some changes. So he had to get that straightened out and took about an extra week.Awesome on the Valley Tech! Just ordered mine about 2 weeks ago. Garrett is such an awesome guy to work with. What options did you go with? Also, what was your lead time?
I went with a tire carrier on the driver side and a ladder on the passenger side with a removable platform for my cooler/storage and hitch receiver. Thats it really. I left off the light pods because I wanted to keep it simple and clean. Figured I can always add it later if needed. I'll post pictures once I get it powder coated and installed.