This Saturday (May 18th) URE Work Day 9AM @ Hunt Camp (1 Viewer)

This site may earn a commission from merchant affiliate
links, including eBay, Amazon, Skimlinks, and others.

fourtrax

SILVER Star
Joined
Jul 7, 2008
Threads
73
Messages
3,280
Location
Just below the apex
Update from Terry

Hi Everyone – This weekend we’ll be concentrating on cutting back trees and brush to make sure the whole trail corridor is clear and folks use the whole trail width since they’re 2 way traffic & to improve visibility. We’ll also clear trees, logs & branches from the tail ditches so the water flows off of the trails better for the sections the contractor hasn’t gotten to yet. We’ll also do trash clean up as we go. Also, I’d like to get the old black plastic culvert on Slab Pile Trail near the junction with Dutch John Trail pulled out to the Dutch John Trailhead where we have the bent piece of old guardrail.



Mike & I will meet you at 9 am at Uwharrie Hunt Camp. If you have loppers please bring them too. I’ll have some there for folks too. Thanks a lot for your help. I appreciate it. Bye - Terry
 
I wish I could make it. It would be really cool if we could win Volunteer Club of the Year two years in a row.
 
The girls and I Represented ONSC today. The 80 is down for repairs so I drove the H3. Not sure if it was the round head lights or the boxiness, but the Jeep club there seemed to accept me and the girls.
C4490E27-4ECF-4CF2-BB57-349A081FDF8A.jpeg


7DE15852-BD05-4C0A-B809-85914A663CA0.jpeg


2D1463A2-19F1-441F-BDE0-6FD70F40F0DA.jpeg


9A5BEB77-D496-42AF-87D5-16D814B8104B.jpeg
 

Users who are viewing this thread

Back
Top Bottom