- Thread starter
- #101
The UZJ dash completely removed with a bunch of stuff, the engien bay is empty and ready to receive the HDJ 2nd battery tray, and the liner that the UZJ doesn't have, then reinstall everything missing
Not shown the fuel tank pipping, tank and filler has been installed under the truck
Not shown the fuel tank pipping, tank and filler has been installed under the truck