The motor on our Seal 9.5/12.5 couldn't be clocked.
The rope attachment point is on the gear housing side.
Yep brain fart - I meant brake side.... which I didn't need to change anyway.
Thanks for the reply, it's mounted in the 80 ARB bar now. Used 1/2" spacers, bought longer bolts but still need LONGER bolts.
Will get it all done and wired up tomorrow.