OTRAMM
Supporting Vendor
We usually use a 9-53 step torque process. Your'e way overthinking install of a giant chunk of iron designed in the 40's. Snug 4 of them in an "x" and then just go around in a circle.
Follow along with the video below to see how to install our site as a web app on your home screen.
Note: This feature may not be available in some browsers.
This site may earn a commission from merchant affiliate
links, including eBay, Amazon, Skimlinks, and others.
Thanks Ryan. So 53 is the final torque spec? I couldn't find it in the FSM but found 34 in the 40 FAQ (who knows where from though).
Martack would have made it a ten minute job...Axles in. I had to remove and separate the short side after I realized I put the birf cage in upside down. That was a 3 hour detour of futility. My zip tie trick for the cir clip took about a dozen tries after I had nailed it on the first go round on the short side. And separating the short side took an hour to get the snap ring off. Oh well. All I'm saying is I better have done the axle alignment right. I don't want to do this job again for a while. And neither does the wife.View attachment 1630607 .