Home Forum Gallery Wiki CruiserFAQ Tech Links Product Reviews Store
IH8MUD.com
Go Back   IH8MUD.com > Social Forums > Land Use

Land Use Get Informed, Get Involved!




Reply
 
LinkBack Thread Tools Display Modes
Old 04-12-07, 12:13 PM   #1 (permalink)
Site Addict

 
petescoffee's Avatar
 
Join Date: Dec 2002
Location: Walnut Creek, CA
Posts: 1,344
Tahoe National Forest Update

Received the following email today, April 12, 2007, from Ann Westling regarding the Tahoe National Forest.

Hi all - the Federal Register published the Notice of Intent yesterday before we expected and we did not get this announcement out to you before hand. We apologize! The information is currently on the TNF website at http://www.fs.fed.us/r5/tahoe/projec...nv/index.shtml The entire Forest map takes a while to load, but you can click on the individual districts/areas that are smaller in size. The comment period extends through May 14. Please see the information below for a general overview and a reminder of the public meetings in the next 2 weeks. Several of you have asked if you need to attend the meeting closest to the trails you are interested in or if the meetings will all be the same. For the most part, the meetings will be similar, however more emphasis will be placed on the trails in the area nearest the meeting. The majority of time at each meeting, however, will be spent reviewing the
criteria as to how the trails were evaluated. The purpose of these
meeting will be to share the Forest Service proposal with you - they will not be hearings to take comment.


Tahoe National Forest
OHV Route Designation/Motorized Travel Management Project
April 2007

Overview
In 2004, the Forest Service started a process to designate off-highway vehicle routes for the Tahoe National Forest as part of a Region-wide effort. This project has grown over the last few years to incorporate new ideas and revised National direction and now includes all (wheeled) motorized travel.

This project was initiated to respond to the growing use of off highway vehicles. It will help establish a system of routes that offers a fun and challenging experience while protecting sensitive areas. This project will only designate trails, routes, or areas on National Forest System land – not on private land.

At the end of this project:
· Some routes that are currently being used for motorized travel (but
are not designated) will be added to the designated trail system;
· Some routes that are currently being used for motorized travel (but
are not designated) will be closed to motorized wheeled vehicle use;
· Seasonal restrictions may be placed on some routes and areas;
· Access to dispersed camping sites may change;
· Some routes/roads may be designated for specific types or widths of
vehicles;
· Motor vehicle use off designated routes, trails, and areas will be
prohibited.

Current Status:
After several years of mapping the existing (non-designated) routes and areas and discussions/meetings with the public to determine popular trails or environmental concerns, the Tahoe National Forest is completing an Environmental Impact Statement to assess various alternatives regarding possible motorized roads, trails and areas and the effects of those alternatives.

A Notice of Intent to prepare an Environmental Impact Statement (EIS) has been published in the Federal Register. A public comment period beginning on April 11 will close on May 14. Comments can be emailed to tnf_rte_desig@fs.fed.us or to Travel Management Team, Tahoe National Forest, 631 Coyote St, Nevada City, CA 95959. Maps that show the proposed routes are available on the Tahoe National Forest website – www.fs.fed.us/r5/tahoe . For those that don’t have web capacity, a map is also available for review at TNF District Offices and the Forest Headquarters.

Identified in the Proposed Action, impacts from the following will be disclosed in the EIS:
1. The addition of 50 miles (48 segments) of existing, unauthorized
trails to the current motorized trail system;
2. The addition of one 60-acre area where the use of wheeled motorized
vehicles by the public would be allowed anywhere within the area;
3. Allowing non-street legal vehicle use on approximately 3 miles of an
existing National Forest System road where such use is currently prohibited;
4. The prohibition of wheeled motorized vehicle travel off designated
roads, trails or areas, except as allowed by permit or other authorization.

Public Meetings:
Three public meetings will be held to share the Forest Service proposal.
These will not be hearings and public comments will not be taken at the
meetings. The emphasis at each meeting will be the trails/roads/areas for
that local area although all the maps will be available at the meetings.

April 18 – Truckee – 6:30 – 9:00 pm – Hampton Inn – 11951 Highway 267 April 24 – Foresthill – 6:30 – 9:00 pm – Foresthill High School Gymnasium, Foresthill Road April 26 – Grass Valley – 6:30 – 9:00 pm – Banner Grange, 12629 McCourtney Road

Additional EIS Comment Period and Timeline The draft EIS is expected to be available for public review in the fall, 2007. A 45-day comment period will follow. The final EIS is expected in the winter, 2008.

Background - 5-Step Process
The TNF has been following a 5-step process outlined in the Regional Route Designation Guidebook.
1. Map existing unauthorized roads, motorized trails, and areas –
Completed 2005
2. Issue Temporary Forest Order prohibiting motorized wheeled vehicle
use off mapped roads, trails, and areas. Expected completion – spring 2007
3. Evaluate inventoried roads, trails and areas and collaborate with the
public in developing a proposed system of roads, trails and areas.
Completed 2006
4. Complete analyses and prepare National Environmental Policy Act
(NEPA) documents. In progress
5. Issue Forest Order prohibiting motor vehicle use off roads,
designated trails and areas. Install signing and publish maps showing designated motorized travel system. Expected completion 2008.

Mailing List:
If anyone would like to be placed on the TNF Travel Management Project mailing list, please contact Ann Westling (awestling@fs.fed.us )

Contacts:
Project Coordinator – Phil Horning (phorning@fs.fed.us) 478-6210 Interdisciplinary Team Leader – David Arrasmith (darrasmith@fs.fed.us )
478-6143

Ann Westling
Tahoe National Forest
Public Affairs Officer
(530) 478-6205


Last edited by petescoffee; 04-12-07 at 12:19 PM. Reason: added direct link to information
petescoffee is offline   Reply With Quote






Reply

Bookmarks

Thread Tools
Display Modes

Posting Rules
You may not post new threads
You may not post replies
You may not post attachments
You may not edit your posts

BB code is On
Smilies are On
[IMG] code is On
HTML code is Off
Trackbacks are On
Pingbacks are On
Refbacks are On








All times are GMT -7. The time now is 02:55 PM.


vBulletin® v3.8.4 ©2000 - 2010, Jelsoft Enterprises Ltd.
Search Engine Friendly URLs by vBSEO 3.3.2
Clubs, Garage Plus, Vendor Tools vBulletin Plugins by Drive Thru Online, Inc.
©2000-2010 by IH8MUD.com - ALL RIGHTS RESERVED

One of the largest message boards on the web !