 |
|
07-02-05, 06:23 PM
|
#1 (permalink)
|
|
fatherofdaughterofromer
Join Date: Sep 2003
Location: Englewood, Colorado
Posts: 7,893
|
Daughterofromer learned the value of Armor - Accident
I am just about to drain the radiator on the 40 when I get the call, " Dad, you better come to Orchard and Dayton right now. I am in a 4 car accident and its not my fault." I asked a few quick questions to make sure she is OK, I then jumped in the 40 a drove over there.
Her runner is getting modified, so she borrowed the Lexus. Good thing she didn't still have the Malibu or it would have gotten squished.
Near as I can tell, Rachel was in the left turn lane and another car was next to her. Both stopped at the red light.
Now an older gentleman (Car farthest from Rachel- in picture 3. Can't see in first 2 pics) was turning from the opposite direction. I think he had a red light, otherwise Rachels would have been green.
a young girl was coming through left to right in the first picture, hit the other car and careened into the Lexus (more like bounced off) and hit the other car waiting at the light.
The most important thing is Rachel and everyone else was fine.
__________________
Ken Romer ~ Friend of Shaman
Keeper of the FAQ, Defender of Newbies, and Slayer of Tards
Commander Rising Sun 4WD Club - K0ROM
97 LX450, Supercharged, Locked, and lots of other stuff ROTW
96 LX450 - ROD's
06 4Runner - Wife's
99 4Runner - daughterofromer's
03 BMW Z4 Roadster
05 AT Horizon
Last edited by Romer; 07-02-05 at 06:39 PM.
|
|
|
07-02-05, 06:25 PM
|
#2 (permalink)
|
|
fatherofdaughterofromer
Join Date: Sep 2003
Location: Englewood, Colorado
Posts: 7,893
|
Its amazing how tough the bumpers are made by ARB. The wife then came and said "I want a bumper on the rear of her 4runner and I'll pay!
__________________
Ken Romer ~ Friend of Shaman
Keeper of the FAQ, Defender of Newbies, and Slayer of Tards
Commander Rising Sun 4WD Club - K0ROM
97 LX450, Supercharged, Locked, and lots of other stuff ROTW
96 LX450 - ROD's
06 4Runner - Wife's
99 4Runner - daughterofromer's
03 BMW Z4 Roadster
05 AT Horizon
|
|
|
07-02-05, 06:27 PM
|
#3 (permalink)
|
|
fatherofdaughterofromer
Join Date: Sep 2003
Location: Englewood, Colorado
Posts: 7,893
|
The silver car hit the bumper starting at the front of her car and it gauged her car all the way down.
Maybe I can convince wife of romer I need a rear bumper too!
__________________
Ken Romer ~ Friend of Shaman
Keeper of the FAQ, Defender of Newbies, and Slayer of Tards
Commander Rising Sun 4WD Club - K0ROM
97 LX450, Supercharged, Locked, and lots of other stuff ROTW
96 LX450 - ROD's
06 4Runner - Wife's
99 4Runner - daughterofromer's
03 BMW Z4 Roadster
05 AT Horizon
|
|
|
07-02-05, 06:38 PM
|
#4 (permalink)
|
|
fatherofdaughterofromer
Join Date: Sep 2003
Location: Englewood, Colorado
Posts: 7,893
|
Here is a pic showing all 4 cars. The one on the right (Brown) is the older gentlemman who was turning. The silver one is the girl who was going through the intersection. The Police are guessing the older gentleman ran the light.
All the passenger side damage to the silver car is fron hitting the Lexus.
__________________
Ken Romer ~ Friend of Shaman
Keeper of the FAQ, Defender of Newbies, and Slayer of Tards
Commander Rising Sun 4WD Club - K0ROM
97 LX450, Supercharged, Locked, and lots of other stuff ROTW
96 LX450 - ROD's
06 4Runner - Wife's
99 4Runner - daughterofromer's
03 BMW Z4 Roadster
05 AT Horizon
Last edited by Romer; 07-02-05 at 06:48 PM.
|
|
|
07-02-05, 06:46 PM
|
#5 (permalink)
|
|
Mod in Hibernation
Join Date: Sep 2004
Location: Where diesels purr and turbos whine
Posts: 6,284
|
now you can claim injuries and milk the system  no not really. Great promo ad!
now why is your red 40 sitting there too? called to the scene I presume?
__________________
-84 BJ60, Finally on the FN road!
-91 FJ80, wife's ride
Iron Butt award winner of the Cruise Moab 08 !
|
|
|
07-02-05, 06:47 PM
|
#6 (permalink)
|
|
fatherofdaughterofromer
Join Date: Sep 2003
Location: Englewood, Colorado
Posts: 7,893
|
Quote:
|
Originally Posted by brownbear
now why is your red 40 sitting there too? called to the scene I presume?
|
Exactly. Came to make sure she was OK and see if anything needed handling
__________________
Ken Romer ~ Friend of Shaman
Keeper of the FAQ, Defender of Newbies, and Slayer of Tards
Commander Rising Sun 4WD Club - K0ROM
97 LX450, Supercharged, Locked, and lots of other stuff ROTW
96 LX450 - ROD's
06 4Runner - Wife's
99 4Runner - daughterofromer's
03 BMW Z4 Roadster
05 AT Horizon
|
|
|
07-02-05, 06:50 PM
|
#7 (permalink)
|
|
Ih8mud stalker
Join Date: Mar 2004
Location: Castle Rock, CO
Posts: 1,113
|
Great everyone is ok, especially your daughter. I wouldn't say that tested the strength of the LX, but it certainly could have, any different split-second decisions by any of them could have landed your daughter right in the middle of that...in anycase, isn't that exactly why you bought the LX, to protect the family...well looks like it's doing pretty good...
__________________
"The pessimist complains about the wind; the optimist expects it to change; the realist adjusts the sails." -William Arthur Ward
'96 4runner, 3.4L, 5sp, E-locker, 242K miles
'85 Mini, 2nd owner...add-ons: 31" MTRs, oil & dirt stains, 190K miles
'00 Echo, 255K miles, 1.5L of FURY! 
|
|
|
07-02-05, 06:51 PM
|
#8 (permalink)
|
|
Forum Lifer
Join Date: Jan 2003
Location: McCall, ID
Posts: 6,674
|
Found any damage other than the scratch on the ARB?
__________________
9/70 FJ40
9/64 FJ45 (L) P-B
4/84 Toy 4x4 Mini PU
We do not see things as they are;
We see things as we are. --Talmud
|
|
|
07-02-05, 06:53 PM
|
#9 (permalink)
|
|
Forum Lifer
Join Date: Sep 2003
Location: bellingham wa/prescott az
Posts: 2,663
|
looks like the runner will need front , rear, and sliders...... hmm maybe you should just be safe and exo it ?
good to see shes fine but then again she was driving an lx450
mike
__________________
1996 LX450 ARB, dual batteries, remote starter, 760 watt sub woofer, in dash CB, Custom switch pannel, cut and turn mod, magnaflow, custom rear bumper, rock lights, 2.5 lift, snorkle. clear side lights, CSC alum spacers, 33s, and more to come.
|
|
|
07-02-05, 06:53 PM
|
#10 (permalink)
|
|
fatherofdaughterofromer
Join Date: Sep 2003
Location: Englewood, Colorado
Posts: 7,893
|
Quote:
|
Originally Posted by IDave
Found any damage other than the scratch on the ARB?
|
Nope, I looked in the engine bay and I climbed underneath. Just the scratches high and low. I think the high one is from her mirror.
__________________
Ken Romer ~ Friend of Shaman
Keeper of the FAQ, Defender of Newbies, and Slayer of Tards
Commander Rising Sun 4WD Club - K0ROM
97 LX450, Supercharged, Locked, and lots of other stuff ROTW
96 LX450 - ROD's
06 4Runner - Wife's
99 4Runner - daughterofromer's
03 BMW Z4 Roadster
05 AT Horizon
|
|
|
07-02-05, 07:15 PM
|
#11 (permalink)
|
|
Carnivore
Join Date: May 2005
Location: Ashland, OR
Posts: 1,790
|
I am glad everyone was OK. Since they have to repaint your bumper for you might as well get it color matched. Leave the uprights black. I wonder if it would be worth it to check it on a frame machine. Probably not.
Fly Rod
|
|
|
07-02-05, 07:22 PM
|
#12 (permalink)
|
|
Forum Lifer
Join Date: Mar 2003
Location: Sacramento, CA
Posts: 8,803
|
ARB -1-
Honda Accord -0-
Glad everyone is fine.
__________________
Andrew
1971 FJ-40 Rubicon tested, 2F powered, SM420, some mods
1976 FJ40 Rusting slowly in the back yard
1984 FJ-60 H41, Toybox, 4.11, SOA, twin sticks and more
1989 FJ-62 125k-Stock, daily driver
1997 FZJ-80 Driveway queen, with door dent
|
|
|
07-02-05, 07:32 PM
|
#13 (permalink)
|
|
250+ Club
Join Date: Aug 2004
Location: Sweet Home Alabama
Posts: 637
|
I am thrilled that your daughter is safe and sound.
It doesn't look like the airbags deployed are they still functional?
When my 17 yo sees these pictures, he will want to try it on mine.
__________________
1981 BJ42
1994 FZJ80 ROTW
1997 FZJ80 40th Anniversary
Victimized by CDan
Court photographer for HRH The Shaman
Honi Soit Qui Mal Y Pense
|
|
|
07-02-05, 07:39 PM
|
#14 (permalink)
|
|
-As-
Join Date: Jul 2004
Location: Reaching Around
Posts: 3,368
|
Wow, that ARB is totaled! you better let me have that one... and let his insurance get you a new one
Is that the girl from the car in that one pic, she looks shaken up, but who wouldn't...
__________________
Eric Hagan - Auburn, AL
94 - Scallywag (noun) a deceitful and unreliable scoundrel
|
|
|
07-02-05, 08:04 PM
|
#15 (permalink)
|
|
250+ Club
Join Date: Mar 2004
Location: SoCal/Mexico
Posts: 523
|
what you don't see in the pics, is the guy from the neighboring state who burned a doughnut in the middle of the crossing and then fled the scene. i tell ya... those people from that state are just jerks!
__________________
"If it’s a good idea and it gets you excited, try it, and if it bursts into flames, that’s going to be exciting too. People always ask, “What is your greatest failure?” I always have the same answer – We’re working on it right now, it’s gonna be awesome!" -Jim
|
|
|
07-02-05, 08:23 PM
|
#16 (permalink)
|
|
Forum Lifer
Join Date: Mar 2003
Location: Camas, WA USA
Posts: 4,265
|
Quote:
|
Originally Posted by rgsiii
It doesn't look like the airbags deployed are they still functional?
|
Airbags are meant to deploy only in certain circumstances, one of which is (for frontal airbags) head on collision. It probably shouldn't go off on a "glancing" blow like that, or a side impact, etc. or even if rear ended. It may also have a speed threshold which doesn't arm it when standing, not sure about all the specifics. Does save alot of money when they don't go off and aren't needed.
__________________
Ben Silva
IH8MUD Site Supporter since July 2004
1996 Lexus LX 450, 144k, locked, Cooper STT 285s, OME 850/863, Slee Blue CC bushings, CDL/Pin 7, LandTank MAF, Powerstop rotors/EBC Green pads/Slee SS brake lines, Slee headlight harness, HIR mod, DIY installed Viper Remote start/alarm system, Mot JDM passenger grab bar, 30qt freezer, 2@aux fuse blocks, aux powerpoint, 850w inverter
1998 Lexus LX 470, 139k Sold
1993 FZJ80 198k miles Sold
My writeups:
HOW TO: DIY Remote Start/Alarm/Keyless Entry
John Deere HIR bulb mod
HOW TO: Fix your leaky windshield
|
|
|
07-02-05, 08:29 PM
|
#17 (permalink)
|
|
Forum Lifer
Join Date: Sep 2003
Location: bellingham wa/prescott az
Posts: 2,663
|
To be honest i dont know when the air bags would go off when you have an arb as i have had several dead on and glancing blows to my ARB and nothing happened. Several hard enough to put dents and bends int he ARB and yet nothing. My guess s unless your really haulen and hit something un movable then your not gonna have and pillows.
mike
__________________
1996 LX450 ARB, dual batteries, remote starter, 760 watt sub woofer, in dash CB, Custom switch pannel, cut and turn mod, magnaflow, custom rear bumper, rock lights, 2.5 lift, snorkle. clear side lights, CSC alum spacers, 33s, and more to come.
|
|
|
07-02-05, 08:55 PM
|
#18 (permalink)
|
|
Forum Lifer
Join Date: Dec 2002
Location: buggerville nj
Posts: 5,985
|
Glad she is ok Romer.
|
|
|
07-02-05, 09:05 PM
|
#19 (permalink)
|
|
Where are my keys?!
Join Date: Jun 2004
Location: Wheat Ridge CO
Posts: 2,741
|
damn...that couldn't have turned out any better.
glad everyone is ok...including the Lexus
Make sure the other car didn't hit the winch cable. It would not be good if it was damaged the next time you used it.
|
|
|
07-02-05, 09:15 PM
|
#20 (permalink)
|
|
Forum Regular
Join Date: Dec 2004
Location: Montgomery, NJ
Posts: 178
|
glad everyone is ok. good shot of the girl in the pink
__________________
Black 97 FZJ80 ~ 153,000m | Silver 06 Honda S2000 ~36,000m
[wish list: oem springs, bilst shocks, toyo mt 33", 1" body lift]
[fix list: a/c, birfs, exhaust, seat belts, windows, alignment]
other hobby: evonetwork
"everything should be made as simple as possible, but not simpler"
|
|
|
07-02-05, 09:41 PM
|
#21 (permalink)
|
|
Forum Lifer
Join Date: Apr 2003
Location: Salt Lake City
Posts: 4,360
|
Save the pictures and send them to ARB. My wife was hit in our 80 my an SL Mercedes. The car hit the truck perpendicular at the ARB and bent the side wing back and under. The Benz went under the bumper lengthwise, opening up it's hood and peeling the fender. When I was replacing the bumper, I happened to mention it to ARB and they were very interested in the photos.
Glad she's OK. Nice bit of flex you're getting off the Honda
|
|
|
07-02-05, 10:31 PM
|
#22 (permalink)
|
|
Dog is my co-pilot.
Join Date: Feb 2005
Location: Seattle, USA
Posts: 2,716
|
Hi All:
Glad to hear that your daughter is safe!
Good pics of the Denver suburbia! ;-)
Gotta love the ARB Bull Bar! I hit a VW Golf in a 45 degree collision - tweaked the sheet metal on one corner of the truck and the corner of the ARB 'Bar, yet the Golf was "totalled."
Sorry about hte whole accident - sucks for everyone involved!
Go sliders and rear bumper!! ;-)
Regards,
Alan
Seattle
|
|
|
07-02-05, 10:57 PM
|
#23 (permalink)
|
|
250+ Club
Join Date: Nov 2002
Location: Pacific NorthWest
Posts: 455
|
Looks like the sticker on the side is totaled. You should sue for pain and suffering! Mental anguish, insomnia keeping you up nights worrying about the replacement sticker....Get a lawyer.
__________________
I have two guns, one for each of you
TLCA#11862
74 FJ40 M-416 trailer, 85 FJ-60, 97 FZJ80-ce (locked and loaded)
2006 Tundra quad cab 4x4
Countdown till she's 18------24 months!
FUCK YOU SPRINT!
|
|
|
07-03-05, 01:06 AM
|
#24 (permalink)
|
|
Site Addict
Join Date: Nov 2004
Location: Queensland
Posts: 1,063
|
Glad your daughter's OK - hope she's not too shaken up. Even small accidents are scary the first time.
So the culprit is the guy in the hat? Always a warning sign for me...
__________________
'97 80
'97 LX 450
|
|
|
07-03-05, 03:06 AM
|
#25 (permalink)
|
|
Forum Regular
Join Date: May 2005
Location: Englewood
Posts: 50
|
Wow, i still can't even believe today. when it first happened i was dialing my dad's cell, work, pager and home like crazy!!! (he was in the garage most likely with music playing) i felt so bad, even though i did nothing wrong, just the fact that it happened to his car while he let me use it upset me. i took a break from that intial panic to get out and check the damage....
Now, i don't think accidents, damage, suffering, etc. are even the slightlest bit humorous but when i finished my appraisal i had to laugh, my mental image was WAY off. Now instead of some huge, dramatic issue i could tell my dad "Hey, i think you just got mom's rear bumper approval!"
Thankfully no one was injured, and while other vehicles' did, my airbags didnt go off, leaving me concsience to type this reply now, since apparently i drive like i should have grandchildren my age.....
I didn't see anything except the final impact with the lexus, but it did take the police a fair amount of time to decide upon guilt between a girl who i thought was 12 (talking on phone to friends, during AND after crash who can be quoted as saying "i thought the light was green...?") and the older gentleman (who seemed not to have realized he was inside a car, let alone the middle of an intersection by his comments)
After everything was clear we got to leave (in the car's that were driven to the scene) feeling annoyed by the time consumption, sorry for non toyota 4x4 drivers, and so very happy we believe in mods!
__________________
'99 limited 4runner: slee sliders, ARB front bumper, Irbis rear bumper, OME lift, Irbis rear drawer system, 33" AT's
Sorry, i STILL don't date 'tards...
"If you're lookin' for answers open your eyes" -Joe Walsh
|
|
|
07-03-05, 03:17 AM
|
#26 (permalink)
|
|
250+ Club
Join Date: Dec 2003
Location: Littleton, Colorado
Posts: 596
|
Hey that street sign looks like Orchard, but, I can't read the other one. What intersection is that?
__________________
'93 80 w/340k and I think it's got one fender and one door that aren't rock enhanced. All the other mods were done with tools.
'77 40 - mental project at this point.
|
|
|
07-03-05, 03:28 AM
|
#27 (permalink)
|
|
Forum Regular
Join Date: May 2005
Location: Englewood
Posts: 50
|
Quote:
|
Originally Posted by Romer
I am just about to drain the radiator on the 40 when I get the call, " Dad, you better come to Orchard and Dayton right now. I am in a 4 car accident and its not my fault." I asked a few quick questions to make sure she is OK, I then jumped in the 40 a drove over there.
.
|
to answer your question tooth fairy...
i was 1.5 miles max from home.....grrrr
__________________
'99 limited 4runner: slee sliders, ARB front bumper, Irbis rear bumper, OME lift, Irbis rear drawer system, 33" AT's
Sorry, i STILL don't date 'tards...
"If you're lookin' for answers open your eyes" -Joe Walsh
|
|
|
07-03-05, 03:48 AM
|
#28 (permalink)
|
|
250+ Club
Join Date: Oct 2002
Posts: 583
|
Air Bags only go off when the car is getting shorter....
Stew
|
|
|
07-03-05, 04:03 AM
|
#29 (permalink)
|
|
Site Addict
Join Date: Nov 2004
Location: Queensland
Posts: 1,063
|
Quote:
|
Originally Posted by daughterofromer
to answer your question tooth fairy...
i was 1.5 miles max from home.....grrrr
|
They say most accidents happen within a mile of home, so you should have been out of the danger zone
Glad you're OK.
David
__________________
'97 80
'97 LX 450
|
|
|
07-03-05, 08:36 AM
|
#30 (permalink)
|
|
Forum Lifer
Join Date: Jan 2003
Location: where men are men and metrosexuals better be making me a CapMo.
Posts: 2,682
|
Quote:
|
Originally Posted by daughterofromer
Wow, i still can't even believe today. when it first happened i was dialing my dad's cell, work, pager and home like crazy!!! (he was in the garage most likely with music playing) i felt so bad, even though i did nothing wrong, just the fact that it happened to his car while he let me use it upset me. i took a break from that intial panic to get out and check the damage....
Now, i don't think accidents, damage, suffering, etc. are even the slightlest bit humorous but when i finished my appraisal i had to laugh, my mental image was WAY off. Now instead of some huge, dramatic issue i could tell my dad "Hey, i think you just got mom's rear bumper approval!"
Thankfully no one was injured, and while other vehicles' did, my airbags didnt go off, leaving me concsience to type this reply now, since apparently i drive like i should have grandchildren my age.....
I didn't see anything except the final impact with the lexus, but it did take the police a fair amount of time to decide upon guilt between a girl who i thought was 12 (talking on phone to friends, during AND after crash who can be quoted as saying "i thought the light was green...?") and the older gentleman (who seemed not to have realized he was inside a car, let alone the middle of an intersection by his comments)
After everything was clear we got to leave (in the car's that were driven to the scene) feeling annoyed by the time consumption, sorry for non toyota 4x4 drivers, and so very happy we believe in mods!
|
I think I can speak for the masses when I say WE'RE ALL GLAD YOU ARE OK! Collisions are a big PITA, but do happen. At least you had the smarts to call Romer immediately!! GOOD GIRL!! I think that's the best advice I ever got when I was starting out.........1) NEVER admit it was your fault and 2) call dad ASAP and have him bring camera. A picture tells a thousand words.......and should you have to battle at all with an insurance company, you have the pics to help. You are wise beyond your years, daughterofromer!!!
Romer......sweet looking 40. I'll be down that way sometime this fall, would like to see it in person if possible.
__________________
Chad
1976 FJ40: TBI350/SM465/SOA/SR/37" MTRs/ARBs/30-Longs/Metal Tech/SROR/Oeyes
1985 Toy Hilux: 6" lift/4.3L/R150F/Marlin's DUC/ARBs/30-Longs/5.29s/37" KM2s/Oeyes
2005 Dodge Ram 2500 CTD bullydogged, airlift
My views on Animal Rights: Animals have the right to be tasty.
Quote:
Originally Posted by Mrs bigndn
If it's got knockers or lockers, he'll be checking it out."
|
|
|
|
 |
|
| Thread Tools |
|
|
| Display Modes |
Linear Mode
|
Posting Rules
|
You may not post new threads
You may not post replies
You may not post attachments
You may not edit your posts
HTML code is Off
|
|
|
|
|
|