 |
|
07-08-08, 12:37 AM
|
#91 (permalink)
|
|
Forum Lifer
Join Date: Mar 2003
Location: Sacramento, CA
Posts: 8,825
|
Holy thread back from the dead!
__________________
Andrew
1971 FJ-40 Rubicon tested, 2F powered, SM420, some mods
1976 FJ40 Rusting slowly in the back yard
1984 FJ-60 H41, Toybox, 4.11, SOA, twin sticks and more
1989 FJ-62 125k-Stock, daily driver
1997 FZJ-80 Driveway queen, with door dent
|
|
|
07-08-08, 12:44 AM
|
#92 (permalink)
|
|
Site Addict
Join Date: Mar 2005
Location: Durango, CO
Posts: 1,800
|
LOL
I didn't notice this was from 05!
__________________
83 FJ60-5" ALCANS-HYSTEER-80 TRE's-RICEBUILT RODS-AUSSIELOCKER-ARB DeerSlayer-LONGFIELDS-35" MTR's-BILSTEIN 5150's-Warn M8000-Ultimate Air-Defender Rack-Rising Sun Roof Clamps-Yukons-Tailgate Storage-Thanks Ige-Groucho-EricS-Corbett-Schmoozer-DurangoDDS-Zen80-Marlin-Bobby-JimC-Proffitts-WagonGear
|
|
|
07-15-08, 12:24 PM
|
#93 (permalink)
|
|
I m m o d e r a t o r
Join Date: Feb 2003
Location: If ya don't know, I ain't tellin'
Posts: 1,146
|
Is she still okay?
__________________
1987 FJ60
1970 Honda CT90
1970 Honda CL350
2010 Jetta TDI Sportwagen
And now, a word from my sponsor
|
|
|
07-15-08, 12:26 PM
|
#94 (permalink)
|
|
1221 Club
Join Date: Feb 2003
Location: SC
Posts: 1,226
|
Quote:
Originally Posted by Jman
Is she still okay?

|
Yep. Last I heard, she got married, and she and FSIMIG are expecting twins any day now.
|
|
|
07-15-08, 03:26 PM
|
#95 (permalink)
|
|
Turbo Diesel Lover
Join Date: Apr 2003
Location: Panamá
Posts: 11,426
|
Quote:
Originally Posted by wob
Yep. Last I heard, she got married, and she and FSIMIG are expecting twins any day now.
|
Damn ! things come fast !
__________________
HJ-60 2H-T Intercooled Tencha
HDJ-80 1HD-T not stock at all ! Marilu
FZJ-80 1FZ-FE ready to Play ( wife rig ! )
Join us at our local Panamá Off Road Forum
Quote:
Originally Posted by crushers
if you are achieveing the max boost then it isn't the boost that is going to kill your engine... it is your right foot.
|
|
|
|
07-15-08, 09:51 PM
|
#96 (permalink)
|
|
still solving problems...
Join Date: Oct 2003
Location: uhhhh...duh...Northern CA
Posts: 5,334
|
Romer has a tard-in-law?
__________________
a couple pairs of pink panties...
Another convert to the Church of Latter Day Swank, a sub-cult of Shahrislam
"...Opportunity doesn't knock, you have to kick the fuckin door in and drag the bitch out screamin." -- Ullr
"I have more respect for people who change their views after acquiring new information than for those who cling to views they held thirty years ago. The world changes. Ideologues and zealots don't." - Michael Crichton
|
|
|
07-17-08, 08:11 AM
|
#97 (permalink)
|
|
fatherofdaughterofromer
Join Date: Sep 2003
Location: Englewood, Colorado
Posts: 7,900
|
Quote:
Originally Posted by wob
Yep. Last I heard, she got married, and she and FSIMIG are expecting twins any day now.
|
She wouldn't touch Stucky.
She is doing great
We went to the Rubicon a few weeks ago together.
Just got an ARB locker for her front axle and was trying it out last week
__________________
Ken Romer ~ Friend of Shaman
Keeper of the FAQ, Defender of Newbies, and Slayer of Tards
Commander Rising Sun 4WD Club - K0ROM
97 LX450, Supercharged, Locked, and lots of other stuff ROTW
96 LX450 - ROD's
06 4Runner - Wife's
99 4Runner - daughterofromer's
03 BMW Z4 Roadster
05 AT Horizon
|
|
|
07-17-08, 08:37 AM
|
#98 (permalink)
|
|
250+ Club
Join Date: Oct 2004
Posts: 549
|
How is the seating position training coming?
Only reason I ask is that I was in an accident a few weeks ago. I got rear ended (in my civic) by a small SUV. At the time, I just happened to be grabbing a drink from the cup holder and leaning forward away from the seat.... because of that, I have a pretty bad case of whiplash. Sucks.
Only point being, sit back... it's less painful.
__________________
Brian K. Gallus
|
|
|
 |
|
| Thread Tools |
|
|
| Display Modes |
Linear Mode
|
Posting Rules
|
You may not post new threads
You may not post replies
You may not post attachments
You may not edit your posts
HTML code is Off
|
|
|
|
|
|