View Single Post
Old 08-12-05, 07:55 AM   #21
bamachem
IH8MUD Regular
 
bamachem's Avatar
 
Join Date: Jul 2004
Location: Gulf Coast
Posts: 234
bulldoze the sides in so they lay int he bottom. punch holes in the deepest part before you do that so the bottom won't hold water. after that, fill w/ construction debris/concrete until about 2' remains. top off w/ some fill dirt, then the top 6-12" with decent top soil then sod over it.


__________________
-Andy
4RNR.NET

SOLD - '99 4Runner Limited 4WD with a bunch of goodies...
'00 Land Cruiser
bamachem is offline   Reply With Quote