View Single Post
Old 01-16-08, 01:36 PM   #9
GeoRoss
IH8MUD Lifer
 
GeoRoss's Avatar
 
Join Date: Dec 2004
Location: Tucson AZ
Posts: 1,011
Quote:
Originally Posted by semlin View Post
that diagram is pretty close. imagine the garage is moved over to the right so it is sticking halfway out into the path of the drive way and you have it. I will have to jog the driveway to make it work. The manouever/parking area will definitely be wider than the driveway.


and yes I will work on vehicles there so you are right, I need room to get in front of the vehicle

Is your septic system to the right of the driveway in the above diagram?


You may want to consider an arc rather than a straight line. That being said, I think the septic tank dictates your choices. Moving a septic system is very expensive.
Attached Images
 


__________________
1994 FZJ80, OME850/864 w/ CSC 1.5" spacers, 285/75 r16 BFG AT/KO, 131K
"SUBDUCTION leads to OROGENY"
"Strip Mining Prevents Forest Fires!" "Stop Continental Drift!"
"Tuff Schist" "Reunite Gondwanaland"
GeoRoss is offline   Reply With Quote